Project Datasets

Overview

The Project datasets provide project-level metrics in CORE, drawn from three related data sources: Projects, Project Metrics - Monthly, and Project Metrics - Cumulative. Most fields are shared across all three; each dataset differs mainly in whether it stores a single current value, a monthly snapshot, or a Project-to-Date (PTD) snapshot. The Fields table below lists every field once and marks which of the three datasets each one is available in.

Dataset Structure

Projects holds current, non-historical project metrics. Each project or phase has a single, always-current record. Filter on Project Level to avoid combining Root Project and Phase totals.

Project Metrics - Monthly and Project Metrics - Cumulative are both multi-level and snapshot-based: they store a record for every project or phase for each reporting month, rather than a single live record. This lets you navigate between different reporting periods, such as for trend or Project-to-Date charts. Filter on Project Level and Month Start before charting; Project Metrics - Cumulative also requires Is Latest to isolate PTD totals. If a chart does not filter to a single level or reporting period, both levels or all periods are included, which may produce inflated or duplicated totals.

Note: Not every field applies to every dataset; see the Projects, Project Metrics - Monthly, and Project Metrics - Cumulative columns in the Fields table below. The Project Level Rollup column indicates whether the field's value rolls up from Phase to Root Project.

Fields

TypeColumnDescriptionCalculationProjectsProject Metrics - MonthlyProject Metrics - CumulativeProject Level Rollup
ValueAll CostTotal cost incurred for the project, including billable and non-billable services and expenses.Billed Cost + Unbilled Cost + Non-Billable Cost

✓

–

✓

✓

ValueAll HoursTotal hours recorded for the project, including billable and non-billable time entries.Billed Hours + Unbilled Hours + Non-Billable Hours

✓

✓

✓

✓

ValueBilledTotal amount invoiced for billable services and expenses, including write-up/down (WUD) adjustments and expense markups. Excludes discounts and miscellaneous invoice adjustments.Billed Contract + Billed Extra

✓

✓

✓

✓

ValueBilled and UnbilledCombined value of billable services and expenses that have been invoiced or are pending invoicing.Billed + Unbilled

✓

–

✓

✓

ValueBilled and Unbilled ContractCombined value of billable contract services and expenses that have been invoiced or are pending invoicing.Billed Contract + Unbilled Contract

✓

–

✓

✓

ValueBilled and Unbilled Contract CostTotal cost associated with billed and unbilled contract services and expenses.Billed Contract Cost + Unbilled Contract Cost

✓

–

✓

✓

ValueBilled and Unbilled Contract ProfitProfit generated from billed and unbilled contract work after associated costs are applied.Billed and Unbilled Contract - All Contract Cost

✓

–

✓

✓

ValueBilled and Unbilled Contract ValueTotal value of billed and unbilled contract services and expenses, excluding write-up/down (WUD) adjustments.Billed and Unbilled Expenses Contract Value + Billed and Unbilled Services Contract Value

✓

–

✓

✓

ValueBilled and Unbilled CostTotal cost associated with billed and unbilled services and expenses.Billed Cost + Unbilled Cost

✓

–

✓

✓

ValueBilled and Unbilled ExpensesCombined value of billable expenses that have been invoiced or are pending invoicing, including markups.Billed Expenses + Unbilled Expenses

✓

–

✓

✓

ValueBilled and Unbilled Expenses ContractCombined value of billable contract expenses that have been invoiced or are pending invoicing, including markups.Billed Expenses Contract + Unbilled Expenses Contract

✓

–

✓

✓

ValueBilled and Unbilled Expenses Contract CostTotal cost associated with billed and unbilled contract expenses.Billed Expenses Contract Cost + Unbilled Expenses Contract Cost

✓

–

✓

✓

ValueBilled and Unbilled Expenses CostTotal cost associated with billed and unbilled expenses.Billed Expenses Cost + Unbilled Expenses Cost

✓

–

✓

✓

ValueBilled and Unbilled Expenses ExtraCombined value of billable extra expenses that have been invoiced or are pending invoicing, including markups.Billed Expenses Extra + Unbilled Expenses Extra

✓

–

✓

✓

ValueBilled and Unbilled Expenses Extra CostTotal cost associated with billed and unbilled extra expenses.Billed Expenses Extra Cost + Unbilled Expenses Extra Cost

✓

–

✓

✓

ValueBilled and Unbilled ExtraCombined value of billable extra services and expenses that have been invoiced or are pending invoicing, including write-up/down (WUD) adjustments and markups.Billed Extra + Unbilled Extra

✓

–

✓

✓

ValueBilled and Unbilled Extra CostTotal cost associated with billed and unbilled extra services and expenses.Billed Extra Cost + Unbilled Extra Cost

✓

–

✓

✓

ValueBilled And Unbilled HoursTotal billable hours that have been invoiced or are pending invoicing.Billed Hours + Unbilled Hours

✓

–

✓

✓

ValueBilled and Unbilled ProfitProfit generated from billed and unbilled work after all associated costs are applied.Billed and Unbilled - All Cost

✓

–

✓

✓

ValueBilled and Unbilled ServicesCombined value of billable services that have been invoiced or are pending invoicing, including write-up/down (WUD) adjustments.Billed Services + Unbilled Services

✓

–

✓

✓

ValueBilled and Unbilled Services ContractCombined value of billable contract services that have been invoiced or are pending invoicing, including write-up/down (WUD) adjustments.Billed Services Contract + Unbilled Services Contract

✓

–

✓

✓

ValueBilled and Unbilled Services Contract CostTotal cost associated with billed and unbilled contract services. Includes services performed by employees, contract employees, and outside consultants.Billed Services Contract Cost + Unbilled Services Contract Cost

✓

–

✓

✓

ValueBilled and Unbilled Services Contract Unloaded CostLabor cost of billed and unbilled contract services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Billed Services Contract Cost + Unbilled Services Contract Cost

✓

–

✓

✓

ValueBilled and Unbilled Services Contract ValueTotal value of billed and unbilled contract services, excluding write-up/down (WUD) adjustments.Billed Services Contract Value + Unbilled Services Contract Value

✓

–

✓

✓

ValueBilled and Unbilled Services CostTotal cost associated with billed and unbilled services. Includes services performed by employees, contract employees, and outside consultants.Billed Services Cost + Unbilled Services Cost

✓

–

✓

✓

ValueBilled and Unbilled Services ExtraCombined value of billable extra services that have been invoiced or are pending invoicing, including write-up/down (WUD) adjustments.Billed Services Extra + Unbilled Services Extra

✓

–

✓

✓

ValueBilled and Unbilled Services Extra CostTotal cost associated with billed and unbilled extra services. Includes services performed by employees, contract employees, and outside consultants.Billed Services Extra Cost + Unbilled Services Extra Cost

✓

–

✓

✓

ValueBilled and Unbilled Services Extra Unloaded CostLabor cost of billed and unbilled extra services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Billed Services Extra Cost + Unbilled Services Extra Cost

✓

–

✓

✓

ValueBilled and Unbilled Services Extra ValueTotal value of billed and unbilled extra services, excluding write-up/down (WUD) adjustments.Billed Services Extra Value + Unbilled Services Extra Value

✓

–

✓

✓

ValueBilled and Unbilled Services ProfitProfit generated from billed and unbilled services after all associated service costs are applied.Billed and Unbilled Services - (Billed Services Cost + Unbilled Services Cost + Non-Billable Services Cost)

✓

–

✓

✓

ValueBilled and Unbilled Services Unloaded CostLabor cost of billed and unbilled services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Billed Services Unloaded Cost + Unbilled Services Unloaded Cost

✓

–

✓

✓

ValueBilled and Unbilled Services ValueTotal value of billed and unbilled services, excluding write-up/down (WUD) adjustments.Billed Services Value + Unbilled Services Value

✓

–

✓

✓

ValueBilled ContractTotal value of billable contract services and expenses that have been invoiced, including write-up/down (WUD) adjustments and markups.Billed Expenses Contract + Billed Services Contract

✓

✓

✓

✓

ValueBilled Contract CostTotal cost associated with billed contract services and expenses.Billed Expenses Contract Cost + Billed Services Contract Cost

✓

✓

✓

✓

ValueBilled Contract ProfitProfit generated from billed contract work after associated contract costs are applied.Billed Contract - (Billed Contract Cost + Non-Billable Contract Cost)

✓

✓

✓

✓

ValueBilled CostTotal cost associated with billed services and expenses.Billed Expenses Cost + Billed Services Cost

✓

✓

✓

✓

ValueBilled DiscountTotal discount amount applied to project invoices.

✓

✓

✓

✓

ValueBilled Employee Services ContractTotal value of billed contract services performed by employees and contract employees. Excludes services performed by outside consultants.Billed Services Contract - Billed Outside Consultant Services Contract

✓

✓

✓

✓

ValueBilled Employee Services ExtraTotal value of billed extra services performed by employees and contract employees. Excludes services performed by outside consultants.Billed Services Extra - Billed Outside Consultant Services Extra

✓

✓

✓

✓

ValueBilled Employee Services Unloaded CostLabor cost of billed employee services before overhead allocations are applied. Includes employees and contract employees but excludes outside consultants.Billed Services Unloaded Cost - Billed Outside Consultant Services Unloaded Cost

✓

✓

✓

✓

ValueBilled ExpensesTotal value of billed expenses, including contract and extra expenses with applicable markups.Billed Expenses Contract + Billed Expenses Extra

✓

✓

✓

✓

ValueBilled Expenses ContractTotal value of billed contract expenses, including applicable markups.Units × Cost × ((100 + Markup)/100)

✓

✓

✓

✓

ValueBilled Expenses Contract CostTotal cost associated with billed contract expenses.Units × Cost

✓

✓

✓

✓

ValueBilled Expenses CostTotal cost associated with billed contract and extra expenses.Units × Cost

✓

✓

✓

✓

ValueBilled Expenses ExtraTotal value of billed extra expenses, including applicable markups.Units × Cost × ((100 + Markup)/100)

✓

✓

✓

✓

ValueBilled Expenses Extra CostTotal cost associated with billed extra expenses.Units × Cost

✓

✓

✓

✓

ValueBilled ExtraTotal value of billed extra services and expenses, including write-up/down (WUD) adjustments and markups.Billed Expenses Extra + Billed Services Extra

✓

✓

✓

✓

ValueBilled Extra CostTotal cost associated with billed extra services and expenses.Billed Expenses Extra Cost + Billed Services Extra Cost

–

✓

✓

✓

ValueBilled HoursTotal billable hours that have been invoiced or included on a final invoice.

✓

✓

✓

✓

ValueBilled Misc AdjustmentTotal miscellaneous invoice adjustments applied to project invoices, excluding discounts.

✓

✓

✓

✓

ValueBilled Outside Consultant Services Contract Unloaded CostLabor cost of billed contract services performed by outside consultants before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueBilled Outside Consultant Services Extra Unloaded CostLabor cost of billed extra services performed by outside consultants before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueBilled Outside Consultant Services Unloaded CostTotal labor cost of billed services performed by outside consultants before overhead allocations are applied.Billed Outside Consultant Services Contract Unloaded Cost + Billed Outside Consultant Services Extra Unloaded Cost

✓

✓

✓

✓

ValueBilled ProfitProfit generated from billed services and expenses after all associated billed and non-billable costs are applied.Billed - (Billed Cost + Non-Billable Cost)

✓

✓

✓

✓

ValueBilled Profit All CostProfit generated from billed services and expenses after all project costs, including billed, unbilled, and non-billable costs, are applied.Billed - All Cost

✓

–

✓

✓

ValueBilled ServicesTotal value of billed services, including write-up/down (WUD) adjustments.Billed Services Contract + Billed Services Extra

✓

✓

✓

✓

ValueBilled Services ContractTotal value of billed contract services, including write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

✓

✓

✓

ValueBilled Services Contract CostTotal cost associated with billed contract services. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueBilled Services Contract Unloaded CostLabor cost of billed contract services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueBilled Services Contract ValueTotal value of billed contract services, excluding write-up/down (WUD) adjustments.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueBilled Services CostTotal cost associated with billed contract and extra services. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueBilled Services ExtraTotal value of billed extra services, including write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

✓

✓

✓

ValueBilled Services Extra CostTotal cost associated with billed extra services. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueBilled Services Extra Unloaded CostLabor cost of billed extra services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueBilled Services Extra ValueTotal value of billed extra services, excluding write-up/down (WUD) adjustments.Actual Hours × Bill Rate

✓

✓

✓

✓

ValueBilled Services ProfitProfit generated from billed services after all associated billed and non-billable service costs are applied.Billed Services - (Billed Services Cost + Non-Billable Services Cost)

✓

✓

✓

✓

ValueBilled Services Unloaded CostTotal labor cost of billed services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueBilled Services ValueTotal value of billed contract and extra services, excluding write-up/down (WUD) adjustments.Actual Hours × Bill Rate

✓

✓

✓

✓

ValueBilled TaxTotal tax amount included on billed invoices.

✓

–

✓

✓

ValueBilled ValueTotal value of billed services and expenses, excluding write-up/down (WUD) adjustments. Excludes discounts and miscellaneous invoice adjustments.Billed Contract Value + Billed Extra Value

✓

✓

✓

✓

ValueBudgetTotal budget amount allocated to the project or phase.Budget Services + Budget Expenses + Budget Misc

✓

–

✓

✓

ValueBudget ExpensesTotal budgeted amount allocated for project expenses.Budget Units × Cost × ((100 + Markup)/100)

✓

–

✓

✓

ValueBudget Expenses RemainingRemaining expense budget available after recorded expenses are applied.Budget Expenses - Spent Expenses

✓

–

✓

✓

ValueBudget HoursTotal budgeted hours allocated to the project or phase.

✓

–

✓

✓

ValueBudget Hours RemainingRemaining budgeted hours available after recorded hours are applied.Budget Hours - Spent Hours

✓

–

✓

✓

ValueBudget Hours Spent PercentPercentage of budgeted hours that have been used.(Spent Hours / Budget Hours) × 100

✓

–

✓

✓

ValueBudget RemainingRemaining project budget available after recorded costs are applied.Budget - Spent

✓

–

✓

✓

ValueBudget ServicesTotal budgeted amount allocated for project services.Budget Hours × Bill Rate

✓

–

✓

✓

ValueBudget Services RemainingRemaining service budget available after recorded service costs are applied.Budget Services - Spent Services

✓

–

✓

✓

ValueBudget Spent PercentPercentage of the total budget that has been used.(Spent / Budget) × 100

✓

–

✓

✓

ValueBudgeted PercentPercentage of the contract amount that has been budgeted.(Budget / Contract) × 100

✓

–

✓

✓

ValueContract AmountTotal contract amount allocated to the project or phase.

–

–

✓

–

ValueContract Billed PercentPercentage of the contract amount that has been billed.(Billed Contract / Contract) × 100

✓

–

✓

✓

ValueContract Billed RemainingRemaining contract amount that has not yet been billed.Contract - Billed Contract

✓

–

✓

✓

ValueContract RemainingRemaining contract value available based on billed and unbilled contract work.Contract - Billed and Unbilled Contract

✓

–

✓

✓

ValueContract Used PercentPercentage of the contract amount that has been used through billed and unbilled contract work.(Billed and Unbilled Contract / Contract) × 100

✓

–

✓

✓

ValueDirect Labor MultiplierMeasures labor efficiency by comparing billed employee service revenue to employee labor cost. A higher value indicates greater revenue generated per labor dollar spent.Billed Employee Services / (Billed Employee Services Unloaded Cost + Non-Billable Employee Services Unloaded Cost)

✓

✓

✓

✓

ValueGross Margin BilledProfit margin for billed work after accounting for discounts and invoice adjustments.(Net Billed Profit / Net Billed) × 100

✓

✓

✓

✓

ValueGross Margin Billed and UnbilledProfit margin for billed and unbilled work after accounting for discounts and invoice adjustments.(Net Billed and Unbilled Profit / Net Billed and Unbilled) × 100

✓

–

✓

✓

ValueGross Margin Billed and Unbilled ContractProfit margin for billed and unbilled contract work after accounting for discounts and invoice adjustments.(Net Billed and Unbilled Contract Profit / Net Billed and Unbilled Contract) × 100

✓

–

✓

✓

ValueGross Margin Billed ContractProfit margin for billed contract work after accounting for discounts and invoice adjustments.(Net Billed Contract Profit / Net Billed Contract) × 100

✓

✓

✓

✓

ValueNet BilledTotal billed amount after discounts and miscellaneous invoice adjustments are applied. Excludes taxes and retainer applications.Billed - Billed Discount + Billed Misc Adjustment

✓

✓

✓

✓

ValueNet Billed and UnbilledCombined net value of billed and unbilled services and expenses after discounts and invoice adjustments are applied to billed amounts. Excludes taxes and retainer applications.Net Billed + Unbilled

✓

–

✓

✓

ValueNet Billed and Unbilled ContractCombined net value of billed and unbilled contract services and expenses after discounts and invoice adjustments are applied to billed amounts.Net Billed Contract + Unbilled Contract

✓

–

✓

✓

ValueNet Billed and Unbilled Contract ProfitProfit generated from billed and unbilled contract work after all associated contract costs are applied.Net Billed and Unbilled Contract - (Billed Contract Cost + Unbilled Contract Cost + Non-Billable Contract Cost)

✓

–

✓

✓

ValueNet Billed and Unbilled ProfitProfit generated from billed and unbilled services and expenses after all associated costs are applied.Net Billed and Unbilled - (Billed Cost + Unbilled Cost + Non-Billable Cost)

✓

–

✓

✓

ValueNet Billed ContractNet billed value of contract services and expenses after discounts and miscellaneous invoice adjustments are applied. Excludes taxes and retainer applications.Billed Contract - Billed Discount + Billed Misc Adjustment

✓

✓

✓

✓

ValueNet Billed Contract ProfitProfit generated from billed contract work after all associated contract costs are applied.Net Billed Contract - (Billed Contract Cost + Non-Billable Contract Cost)

✓

✓

✓

✓

ValueNet Billed ProfitProfit generated from billed services and expenses after all associated billed and non-billable costs are applied.Net Billed - (Billed Cost + Non-Billable Cost)

✓

✓

✓

✓

ValueNet Billed Profit All CostProfit generated from billed services and expenses after all project costs, including billed, unbilled, and non-billable costs, are applied.Net Billed - All Cost

✓

–

✓

✓

ValueNet Realization RatePercentage of potential billable revenue that was realized after discounts and invoice adjustments are applied.(Net Billed / Billed Value) × 100

✓

✓

✓

✓

ValueNon-BillableTotal value of non-billable services and expenses recorded for the project.Non-Billable Services + Non-Billable Expenses

✓

–

✓

✓

ValueNon-Billable ContractTotal value of non-billable contract services and expenses recorded for the project.

✓

–

✓

✓

ValueNon-Billable Contract CostTotal cost associated with non-billable contract services and expenses.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable CostTotal cost associated with non-billable services and expenses.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable Employee Services Unloaded CostLabor cost of non-billable employee services before overhead allocations are applied. Excludes services performed by outside consultants.Non-Billable Services Unloaded Cost - Non-Billable Outside Consultant Services Unloaded Cost

✓

✓

✓

✓

ValueNon-Billable ExpensesTotal value of non-billable expenses, including applicable markups.Non-Billable Expenses Contract + Non-Billable Expenses Extra

✓

–

✓

✓

ValueNon-Billable Expenses ContractTotal value of non-billable contract expenses, including applicable markups.Units × Cost × ((100 + Markup)/100)

✓

–

✓

✓

ValueNon-Billable Expenses Contract CostContract CostUnits × Cost

✓

✓

✓

✓

ValueNon-Billable Expenses CostTotal cost associated with non-billable contract and extra expenses.Units × Cost

✓

✓

✓

✓

ValueNon-Billable Expenses ExtraTotal value of non-billable extra expenses, including applicable markups.Units × Cost × ((100 + Markup)/100)

✓

–

✓

✓

ValueNon-Billable Expenses Extra CostTotal cost associated with non-billable extra expenses.Units × Cost

✓

✓

✓

✓

ValueNon-Billable ExtraTotal value of non-billable extra services and expenses recorded for the project.

✓

–

✓

✓

ValueNon-Billable Extra CostTotal cost associated with non-billable extra services and expenses.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable HoursTotal non-billable hours recorded for the project.

✓

✓

✓

✓

ValueNon-Billable Outside Consultant Services Contract Unloaded CostLabor cost of non-billable contract services performed by outside consultants before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueNon-Billable Outside Consultant Services Extra Unloaded CostLabor cost of non-billable extra services performed by outside consultants before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueNon-Billable Outside Consultant Services Unloaded CostTotal labor cost of non-billable services performed by outside consultants before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueNon-Billable ServicesTotal value of non-billable services recorded for the project, including write-up/down (WUD) adjustments.Non-Billable Services Contract + Non-Billable Services Extra

✓

–

✓

✓

ValueNon-Billable Services ContractTotal value of non-billable contract services recorded for the project, including write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

–

✓

✓

ValueNon-Billable Services Contract CostTotal cost associated with non-billable contract services.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable Services Contract Unloaded CostLabor cost of non-billable contract services before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueNon-Billable Services CostTotal cost associated with non-billable contract and extra services.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable Services ExtraTotal value of non-billable extra services recorded for the project, including write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

–

✓

✓

ValueNon-Billable Services Extra CostTotal cost associated with non-billable extra services.Actual Hours × Cost Rate

✓

✓

✓

✓

ValueNon-Billable Services Extra Unloaded CostLabor cost of non-billable extra services before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueNon-Billable Services Unloaded CostTotal labor cost of non-billable services before overhead allocations are applied.Actual Hours × Pay Rate

✓

✓

✓

✓

ValueOpen AROutstanding accounts receivable balance for the project. Does not include write-offs.

✓

–

✓

✓

ValuePaidTotal payments applied to project invoices.

✓

✓

✓

✓

ValuePercent CompletePercentage of project completion entered manually for the project or phase.

✓

–

✓

–

ValuePhase ContractTotal contract amount from all child phases associated with the project.

✓

–

✓

–

ValueProject Margin BilledProfit margin for billed work. Includes billed services and expenses but excludes discounts and miscellaneous invoice adjustments.(Billed Profit / Billed) × 100

✓

✓

✓

✓

ValueProject Margin Billed All CostProfit margin for billed work based on all project costs, including billed, unbilled, and non-billable costs. Excludes discounts and miscellaneous invoice adjustments.(Billed Profit All Cost / Billed) × 100

✓

–

✓

✓

ValueProject Margin Billed and UnbilledProfit margin for billed and unbilled work. Includes contract and extra services and expenses while excluding discounts and miscellaneous invoice adjustments.(Billed and Unbilled Profit / Billed and Unbilled) × 100

✓

–

✓

✓

ValueProject Margin Billed and Unbilled ContractProfit margin for billed and unbilled contract work. Includes contract services and expenses while excluding discounts and miscellaneous invoice adjustments.(Billed and Unbilled Contract Profit / Billed and Unbilled Contract) × 100

✓

–

✓

✓

ValueProject Margin Billed and Unbilled ServicesProfit margin for billed and unbilled services. Includes contract and extra services while excluding discounts and miscellaneous invoice adjustments.(Billed and Unbilled Services Profit / Billed and Unbilled Services) × 100

✓

–

✓

✓

ValueProject Margin Billed ContractProfit margin for billed contract work. Includes contract services and expenses while excluding discounts and miscellaneous invoice adjustments.(Billed Contract Profit / Billed Contract) × 100

✓

✓

✓

✓

ValueProject Margin Billed ServicesProfit margin for billed services. Includes contract and extra services while excluding discounts and miscellaneous invoice adjustments.(Billed Services Profit / Billed Services) × 100

✓

✓

✓

✓

ValueRealization RatePercentage of potential billable revenue that was realized through invoicing. Excludes discounts and miscellaneous invoice adjustments.(Billed / Billed Value) × 100

✓

✓

✓

✓

ValueRetainer AppliedTotal retainer amount applied to project invoices.

✓

✓

✓

✓

ValueRetainer BalanceThe current retainer balance of this project or phase.

✓

–

✓

–

ValueRetainer ReceivedThe total retainer received for this project or phase.

✓

✓

✓

–

ValueSpentTotal amount spent on project services and expenses.Spent Services + Spent Expenses

✓

–

✓

✓

ValueSpent ExpensesTotal value of expenses recorded against the project, including applicable markups.Spent Units × Cost × ((100 + Markup)/100)

✓

–

✓

✓

ValueSpent HoursTotal hours recorded for the project, including billable and non-billable time entries.

✓

–

✓

✓

ValueSpent ServicesTotal value of services recorded against the project, excluding write-up/down (WUD) adjustments.Spent Hours × Bill Rate

✓

–

✓

✓

ValueUnbilledTotal value of billable services and expenses that have not yet been invoiced. Includes write-up/down (WUD) adjustments and expense markups. Excludes discounts and miscellaneous invoice adjustments.Unbilled Contract + Unbilled Extra

✓

–

✓

✓

ValueUnbilled ContractTotal value of billable contract services and expenses that have not yet been invoiced. Includes write-up/down (WUD) adjustments and expense markups.Unbilled Expenses Contract + Unbilled Services Contract

✓

–

✓

✓

ValueUnbilled Contract CostTotal cost associated with unbilled contract services and expenses.Unbilled Expenses Contract Cost + Unbilled Services Contract Cost

✓

–

✓

✓

ValueUnbilled CostTotal cost associated with unbilled services and expenses.Unbilled Expenses Cost + Unbilled Services Cost

✓

–

✓

✓

ValueUnbilled ExpensesTotal value of billable expenses that have not yet been invoiced, including applicable markups.Unbilled Expenses Contract + Unbilled Expenses Extra

✓

–

✓

✓

ValueUnbilled Expenses ContractTotal value of billable contract expenses that have not yet been invoiced, including applicable markups.Units × Cost × ((100 + Markup)/100)

✓

–

✓

✓

ValueUnbilled Expenses Contract CostTotal cost associated with unbilled contract expenses.Units × Cost

✓

–

✓

✓

ValueUnbilled Expenses CostTotal cost associated with unbilled contract and extra expenses.Units × Cost

✓

–

✓

✓

ValueUnbilled Expenses ExtraTotal value of billable extra expenses that have not yet been invoiced, including applicable markups.Markup)/100)

✓

–

✓

✓

ValueUnbilled Expenses Extra CostTotal cost associated with unbilled extra expenses.Units × Cost

✓

–

✓

✓

ValueUnbilled ExtraTotal value of billable extra services and expenses that have not yet been invoiced. Includes write-up/down (WUD) adjustments and expense markups.Unbilled Expenses Extra + Unbilled Services Extra

✓

–

✓

✓

ValueUnbilled Extra CostTotal cost associated with unbilled extra services and expenses.Unbilled Expenses Contract Cost + Unbilled Services Contract Cost

✓

–

✓

✓

ValueUnbilled HoursTotal billable hours that have not yet been invoiced.

✓

–

✓

✓

ValueUnbilled ServicesTotal value of billable services that have not yet been invoiced. Includes write-up/down (WUD) adjustments.Unbilled Services Contract + Unbilled Services Extra

✓

–

✓

✓

ValueUnbilled Services ContractTotal value of billable contract services that have not yet been invoiced. Includes write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

–

✓

✓

ValueUnbilled Services Contract CostTotal cost associated with unbilled contract services. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

–

✓

✓

ValueUnbilled Services Contract Unloaded CostLabor cost of unbilled contract services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Pay Rate

✓

–

✓

✓

ValueUnbilled Services Contract ValueTotal value of unbilled contract services, excluding write-up/down (WUD) adjustments.Bill Rate × Actual Hours

✓

–

✓

✓

ValueUnbilled Services CostTotal cost associated with unbilled contract and extra services. Includes services performed by employees, contract employees, and outside consultants.Unbilled Services Contract Cost + Unbilled Services Extra Cost

✓

–

✓

✓

ValueUnbilled Services ExtraTotal value of billable extra services that have not yet been invoiced. Includes write-up/down (WUD) adjustments.Bill Rate × Client Hours × WUD Multiplier

✓

–

✓

✓

ValueUnbilled Services Extra CostTotal cost associated with unbilled extra services. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Cost Rate

✓

–

✓

✓

ValueUnbilled Services Extra Unloaded CostLabor cost of unbilled extra services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Actual Hours × Pay Rate

✓

–

✓

✓

ValueUnbilled Services Extra ValueTotal value of unbilled extra services, excluding write-up/down (WUD) adjustments.Bill Rate × Actual Hours

✓

–

✓

✓

ValueUnbilled Services Unloaded CostTotal labor cost of unbilled services before overhead allocations are applied. Includes services performed by employees, contract employees, and outside consultants.Unbilled Services Contract Unloaded Cost + Unbilled Services Extra Unloaded Cost

✓

–

✓

✓

ValueUnbilled Services ValueTotal value of unbilled contract and extra services, excluding write-up/down (WUD) adjustments.Unbilled Services Contract Value + Unbilled Services Extra Value

✓

–

✓

✓

ValueUtilization RatePercentage of total recorded hours that are billable.(Billable Hours / All Hours) × 100

✓

✓

✓

✓

ValueWriteoffTotal amount written off for the project or phase.

✓

✓

✓

✓

CategoryContract TypeBilling arrangement assigned to the project or phase. Values include Hourly, Fixed, HNTE, Recurring, Cost Plus, and other supported contract types.

✓

✓

✓

✓

CategoryRoot Project Contract TypeBilling arrangement assigned to the top-level project.

✓

✓

✓

✓

CategoryProject CityCity associated with the project location.

✓

✓

✓

✓

CategoryProject CountryCountry associated with the project location.

✓

✓

✓

✓

CategoryCurrencyCurrency assigned to the project or phase.

✓

✓

✓

✓

CategoryProject StatusCurrent status of the project or phase. Values include Active, Completed, Hold, Inactive, Canceled, Draft, and Unknown.

✓

✓

✓

✓

CategoryRoot Project StatusCurrent status of the top-level project, such as Active, Completed, Hold, Inactive, Canceled, Draft, or Unknown.

✓

✓

✓

✓

CategoryCreated OnDate and time the project or phase was created.

✓

–

✓

✓

CategoryClient SinceDate the client record was created or became active.

✓

✓

✓

✓

CategoryDefault Client GroupDefault client group associated with the project's client.

✓

✓

✓

✓

CategoryClient CurrencyDefault currency assigned to the client.

✓

–

✓

✓

CategoryClient Fee ScheduleDefault fee schedule assigned to the client.

✓

–

✓

✓

CategoryClient TermsDefault payment terms assigned to the client.

✓

✓

✓

✓

CategoryProject Display NameDisplay name of the project or phase.

✓

✓

✓

✓

CategoryProject Due DateDue date assigned to the project or phase.

✓

✓

✓

✓

CategoryRoot Project Due DateDue date assigned to the top-level project.

✓

✓

✓

✓

CategoryClient ManagerEmployee assigned as the client manager.

✓

✓

✓

✓

CategoryProject ManagerEmployee assigned as the project manager.

✓

✓

✓

✓

CategoryProject OriginatorEmployee assigned as the project originator.

✓

✓

✓

✓

CategoryProject PrincipalEmployee assigned as the project principal.

✓

✓

✓

✓

CategoryRoot Project ManagerEmployee assigned as the top-level project's manager.

✓

✓

✓

✓

CategoryRoot Project OriginatorEmployee assigned as the top-level project's originator.

✓

✓

✓

✓

CategoryRoot Project PrincipalEmployee assigned as the top-level project's principal.

✓

✓

✓

✓

CategoryExpense AccountExpense account associated with the project or phase.

✓

✓

✓

✓

CategoryClient Fed IDFederal tax identification number associated with the client.

✓

✓

✓

✓

CategoryFee ScheduleFee schedule assigned to the project or phase.

✓

✓

✓

✓

CategoryMonth StartFirst day of the reporting month represented by the record. For historical records, this represents the month being reported. For the current record, it represents the current month.

–

✓

✓

✓

CategoryClient First NameFirst name of the client contact.

✓

✓

✓

✓

CategoryProject LevelHierarchy level of the project record, such as project, phase, or subphase.

✓

✓

✓

✓

CategoryRule: ShowInBatchInvIdentifies if the 'Always show in Invoice Batch' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: AutoApproveTimeIdentifies if the 'Auto approve time entries' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: AutoEmailInvIdentifies if the 'Automatically email invoice when processed' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: AccountSummaryOnInvIdentifies if the 'Show account summary on invoice' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LinkExpAttachmentsIdentifies if the 'Automatically link expense entry attachments to invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LinkTimeAttachmentsIdentifies if the 'Automatically link time entry attachments to invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: NoProjectControlIdentifies if the 'Do not apply project assignment settings' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: ExemptItemTaxIdentifies if the 'Exempt item tax 1/2/3' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: GenerateWIPRevenueIdentifies if the 'Generate WIP Revenue' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: HideNonBillableExpIdentifies if the 'Hide non-billable expense entries on invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: HideNonBillableTimeIdentifies if the 'Hide non-billable time entries on invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: ExpPartOfContractIdentifies if the 'Include billable expenses in the contract amount' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LinkVendorBillAttachmentsIdentifies if the 'Link vendor bill attachments to invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: METExcludesItemTaxIdentifies if the 'Main Expense Tax excludes Tax 1/2/3' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: MSTExcludesItemTaxIdentifies if the 'Main Service Tax excludes Tax 1/2/3' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: ExpenseMemoReqIdentifies if the 'Memo is required for expense entry' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: TimeMemoReqIdentifies if the 'Memo is required for time entry' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LockAllocatedUnitsIdentifies if the 'Prevent expense entry after reaching allocated units' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: PreventExpIdentifies if the 'Prevent expense entry for the project' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: PreventTimeIdentifies if the 'Prevent time entry for the project' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LockContractAmtIdentifies if the 'Prevent time and expense entry after reaching contract amount' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: LockAllocatedHoursIdentifies if the 'Prevent time entry after reaching allocated hours' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: ProjectClassOverVendorClassIdentifies if the 'Project class supersedes vendor class' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: BudgetedActOnlyIdentifies if the 'Restrict time and expenses to budgeted activities/employees/expenses' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: BudgetedEmpOnlyIdentifies if the 'Restrict time and expenses to budgeted activities/employees/expenses' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: BudgetedExpOnlyIdentifies if the 'Restrict time and expenses to budgeted activities/employees/expenses' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: SendAsJointInvIdentifies if the 'Send as joint invoice' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: AutoApproveExpIdentifies if the 'Auto approve expense entries' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: CombinedGSTOnInvIdentifies if the 'Show combined GST on invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: ShowRetSummaryOnInvIdentifies if the 'Show retainer summary on invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: SkipAutoExpEvalIdentifies if the 'Skip automatic expense entry evaluation' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: SkipAutoTimeEvalIdentifies if the 'Skip automatic time entry evaluation' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: BudgetStartAndEndIdentifies if the 'Updates to project start and end dates should apply to all budget items' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: RatesUseActivityIdentifies if the 'Use bill rates and cost rates from activity before bill rates from resource' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: UseProjMemoOnInvIdentifies if the 'Use project memo on invoices' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryRule: UseRatesByClassificationIdentifies if the 'Use rates by classification' rule is applied to the Project/Phase.

✓

–

✓

✓

CategoryIncome AccountIncome account associated with the project or phase.

✓

✓

✓

✓

CategoryIs DeletedIndicates whether the project or phase has been deleted. Values are True or False.

✓

✓

✓

✓

CategoryActive In PeriodIndicates whether the project was active during the reporting month. A project is considered active if its end date falls after the reporting period or if it has time entries, expenses, invoices, or payments recorded during or after the reporting month.

–

–

✓

✓

CategoryIs LatestIndicates whether the record represents the most current reporting period. Values are True or False.

–

–

✓

✓

CategoryClient Last NameLast name of the client contact.

✓

✓

✓

✓

CategoryClient Middle InitialMiddle initial of the client contact.

✓

–

✓

✓

CategoryClientName of the client associated with the project or phase.

✓

✓

✓

✓

CategoryRoot Project ClientName of the client associated with the top-level project.

✓

✓

✓

✓

CategoryPhase Name (Level 1)Name of the level 1 phase. For lower-level phases, displays the associated level 1 parent phase name.

✓

✓

✓

✓

CategoryPhase Name (Level 2)Name of the level 2 phase. For level 3 phases, displays the associated level 2 parent phase name.

✓

✓

✓

✓

CategoryPhase Name (Level 3)Name of the level 3 phase.

✓

✓

✓

✓

CategoryProject NameName of the project or phase.

✓

✓

✓

✓

CategoryRoot Project NameName of the top-level project associated with the project hierarchy.

✓

✓

✓

✓

CategoryClient MemoNotes or memo entered for the client.

✓

–

✓

✓

CategoryProject Sort OrderNumeric value used to determine the display order of phases and subphases within a project.

✓

✓

✓

✓

CategoryTermsPayment terms assigned to the project.

✓

✓

✓

✓

CategoryRoot Project % CompletePercentage of completion entered manually for the top-level project.

✓

✓

✓

✓

CategoryPhase Number and Name (Level 1)Phase number and name of the level 1 phase. For lower-level phases, displays the associated level 1 parent phase information.

✓

✓

✓

✓

CategoryPhase Number and Name (Level 2)Phase number and name of the level 2 phase. For level 3 phases, displays the associated level 2 parent phase information.

✓

✓

✓

✓

CategoryPhase Number and Name (Level 3)Phase number and name of the level 3 phase.

✓

✓

✓

✓

CategoryClassProject class assigned to the project or phase.

✓

✓

✓

✓

CategoryRoot Project ClassProject class assigned to the top-level project.

✓

✓

✓

✓

CategoryProject PO#Purchase order number associated with the project or phase.

✓

✓

✓

✓

CategoryRoot Project POPurchase order number associated with the top-level project.

✓

✓

✓

✓

CategoryProject Start DateStart date assigned to the project or phase.

✓

✓

✓

✓

CategoryRoot Project Start DateStart date assigned to the top-level project.

✓

✓

✓

✓

CategoryStateState or province associated with the project location.

✓

✓

✓

✓

CategoryClient StatusStatus of the client record. Values include Active and Inactive.

✓

✓

✓

✓

CategoryDefault Project GroupThe default project group of this project

✓

✓

✓

✓

CategoryParent Project Display NameThe display name of the Parent Project

✓

✓

✓

✓

CategoryContract Type IDThe enum value of the Contract Type field

✓

–

✓

✓

CategoryProject Status IDThe enum value of the Project Status field

✓

–

✓

✓

CategoryProject Type IDThe enum value of the Project Type field

✓

–

✓

✓

CategoryAddress Line 1The first line of the address of this project

✓

✓

✓

✓

CategoryParent Project IDThe ID of the parent project

✓

✓

✓

✓

CategoryJoint Invoice TemplateThe Joint Invoice Template assigned to this project, if any.

✓

✓

✓

✓

CategoryManual Invoice TemplateThe Manual Invoice Template assigned to this project, if any.

✓

✓

✓

✓

CategoryProject IDThe Project ID associated with this project or phase.

✓

✓

✓

✓

CategoryParent Project NameThe Project Name of the direct parent of this project or phase.

✓

✓

✓

✓

CategoryRoot Project Display NameThe Root Project Display name of this project or phase.

✓

✓

✓

✓

CategoryRoot Project IDThe Root Project ID of this project or phase.

✓

✓

✓

✓

CategoryAddress Line 2The second line of the address associated with this project

✓

✓

✓

✓

CategoryStandard Invoice TemplateThe Standard Invoice Template assigned to this project, if any.

✓

✓

✓

✓

CategoryParent Project UIDThe unique identifier of the direct parent to this Project

✓

✓

✓

✓

CategoryParent Project UID (Level 1)The unique identifier of the Level 1 Parent Project

✓

–

✓

✓

CategoryParent Project UID (Level 2)The unique identifier of the Level 2 Parent Project

✓

–

✓

✓

CategoryClient Manager UIDThe unique identifier of the Client Manager associated with the Client of this Project

✓

–

✓

✓

CategoryClient Fee Schedule UIDThe unique identifier of the Fee Schedule of the Client associated with this Project.

✓

–

✓

✓

CategoryFee Schedule UIDThe unique identifier of the Fee Schedule of this Project

✓

–

✓

✓

CategoryManager UIDThe unique identifier of the Manager of the Project

✓

–

✓

✓

CategoryOriginator UIDThe unique identifier of the Originator of the Project

✓

–

✓

✓

CategoryPrincipal UIDThe unique identifier of the Principal associated with the Project

✓

–

✓

✓

CategoryProspect UIDThe unique identifier of the Prospect associated with the Project

✓

–

✓

✓

CategoryProject Zip CodeThe zip code of the project

✓

✓

✓

✓

CategoryProject TypeType of project record. Values include Main and Standard.

✓

✓

✓

✓

CategoryRoot Project TypeType of the top-level project record. Values include Main and Standard.

✓

✓

✓

✓

CategoryClient UIDUnique identifier assigned to the client.

✓

✓

✓

✓

CategoryProject UIDUnique identifier assigned to the project or phase.

✓

✓

✓

✓

CategoryRoot Project UIDUnique identifier assigned to the top-level project in the hierarchy.

✓

✓

✓

✓

CategorySort SequenceUnique value used to determine the display order of projects, phases, and subphases within the project hierarchy.

✓

✓

✓

✓